Saad, E., Keshk, H., Saleh, M., Hamam, A. (2007). SCHEDULING HARD REAL-TIME TASKS WITH PRECEDENCE CONSTRAINTS ON MULTIPROCESSOR SYSTEMS. test, 35(No 6), 1443-1453. doi: 10.21608/jesaun.2007.114578
E. M. Saad; H. A. Keshk; M. A. Saleh; A.A. Hamam. "SCHEDULING HARD REAL-TIME TASKS WITH PRECEDENCE CONSTRAINTS ON MULTIPROCESSOR SYSTEMS". test, 35, No 6, 2007, 1443-1453. doi: 10.21608/jesaun.2007.114578
Saad, E., Keshk, H., Saleh, M., Hamam, A. (2007). 'SCHEDULING HARD REAL-TIME TASKS WITH PRECEDENCE CONSTRAINTS ON MULTIPROCESSOR SYSTEMS', test, 35(No 6), pp. 1443-1453. doi: 10.21608/jesaun.2007.114578
Saad, E., Keshk, H., Saleh, M., Hamam, A. SCHEDULING HARD REAL-TIME TASKS WITH PRECEDENCE CONSTRAINTS ON MULTIPROCESSOR SYSTEMS. test, 2007; 35(No 6): 1443-1453. doi: 10.21608/jesaun.2007.114578