Hashem, A., farouk, A., Abd El-Fatah, M. (2020). VALUE MANAGEMENT OF THE RISKS FOR THE IMPLEMENTATION OF FAST-TRACKING (SDFT) CONSTRUCTION PROJECTS. test, 15(57), 1064-1073. doi: 10.21608/auej.2020.120421
Amira Hashem; Akram farouk; moataz Abd El-Fatah. "VALUE MANAGEMENT OF THE RISKS FOR THE IMPLEMENTATION OF FAST-TRACKING (SDFT) CONSTRUCTION PROJECTS". test, 15, 57, 2020, 1064-1073. doi: 10.21608/auej.2020.120421
Hashem, A., farouk, A., Abd El-Fatah, M. (2020). 'VALUE MANAGEMENT OF THE RISKS FOR THE IMPLEMENTATION OF FAST-TRACKING (SDFT) CONSTRUCTION PROJECTS', test, 15(57), pp. 1064-1073. doi: 10.21608/auej.2020.120421
Hashem, A., farouk, A., Abd El-Fatah, M. VALUE MANAGEMENT OF THE RISKS FOR THE IMPLEMENTATION OF FAST-TRACKING (SDFT) CONSTRUCTION PROJECTS. test, 2020; 15(57): 1064-1073. doi: 10.21608/auej.2020.120421