El-Samadony, A., Tantawy, M., Atta, M. (2020). Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects. test, 48(No 6), 1196-1221. doi: 10.21608/jesaun.2021.169075
Adel El-Samadony; Mohamed Tantawy; Mohamed M. Atta. "Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects". test, 48, No 6, 2020, 1196-1221. doi: 10.21608/jesaun.2021.169075
El-Samadony, A., Tantawy, M., Atta, M. (2020). 'Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects', test, 48(No 6), pp. 1196-1221. doi: 10.21608/jesaun.2021.169075
El-Samadony, A., Tantawy, M., Atta, M. Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects. test, 2020; 48(No 6): 1196-1221. doi: 10.21608/jesaun.2021.169075