Belal, M., Elhakeem, A. (2023). Optimal construction scheduling: A trade-off approach between project time, cost, and residual flexibility. test, 7(2), 125-134. doi: 10.21608/ejmtc.2023.210826.1255
Mohammed Adel Belal; Ahmed Abdelmoaty Elhakeem. "Optimal construction scheduling: A trade-off approach between project time, cost, and residual flexibility". test, 7, 2, 2023, 125-134. doi: 10.21608/ejmtc.2023.210826.1255
Belal, M., Elhakeem, A. (2023). 'Optimal construction scheduling: A trade-off approach between project time, cost, and residual flexibility', test, 7(2), pp. 125-134. doi: 10.21608/ejmtc.2023.210826.1255
Belal, M., Elhakeem, A. Optimal construction scheduling: A trade-off approach between project time, cost, and residual flexibility. test, 2023; 7(2): 125-134. doi: 10.21608/ejmtc.2023.210826.1255