F., B., A., E., G., H. (2001). Real-time Implementation of Proposed Electro-mechanical Control System for Automation of Main Gearbox and Clutch Operations of Motor Vehicles. test, 9(ASAT Conference, 8-10 May 2001), 1-21. doi: 10.21608/asat.2001.31157
Bahgat S. F.; El-Haddad M. A.; Hammad G.. "Real-time Implementation of Proposed Electro-mechanical Control System for Automation of Main Gearbox and Clutch Operations of Motor Vehicles". test, 9, ASAT Conference, 8-10 May 2001, 2001, 1-21. doi: 10.21608/asat.2001.31157
F., B., A., E., G., H. (2001). 'Real-time Implementation of Proposed Electro-mechanical Control System for Automation of Main Gearbox and Clutch Operations of Motor Vehicles', test, 9(ASAT Conference, 8-10 May 2001), pp. 1-21. doi: 10.21608/asat.2001.31157
F., B., A., E., G., H. Real-time Implementation of Proposed Electro-mechanical Control System for Automation of Main Gearbox and Clutch Operations of Motor Vehicles. test, 2001; 9(ASAT Conference, 8-10 May 2001): 1-21. doi: 10.21608/asat.2001.31157