Abdel-Galil, E., Hussein, A., Alborkan, A. (2018). Cost Assessment of preconstruction phase for Construction Projects in Egypt. test, 22(2), 19-31. doi: 10.21608/pserj.2018.32093
Emad Abdel-Galil; Ahmed Hussein; Ahmed Alborkan. "Cost Assessment of preconstruction phase for Construction Projects in Egypt". test, 22, 2, 2018, 19-31. doi: 10.21608/pserj.2018.32093
Abdel-Galil, E., Hussein, A., Alborkan, A. (2018). 'Cost Assessment of preconstruction phase for Construction Projects in Egypt', test, 22(2), pp. 19-31. doi: 10.21608/pserj.2018.32093
Abdel-Galil, E., Hussein, A., Alborkan, A. Cost Assessment of preconstruction phase for Construction Projects in Egypt. test, 2018; 22(2): 19-31. doi: 10.21608/pserj.2018.32093