Abou-Aly, A., Khodeir, L., ElAbd, N. (2024). Identification of the Need for Agile Methodologies in Construction Projects Design Management. test, 7(2), 152-166. doi: 10.21608/fuje.2024.343809
Ahmad Abou-Aly; Laila Khodeir; Nouran ElAbd. "Identification of the Need for Agile Methodologies in Construction Projects Design Management". test, 7, 2, 2024, 152-166. doi: 10.21608/fuje.2024.343809
Abou-Aly, A., Khodeir, L., ElAbd, N. (2024). 'Identification of the Need for Agile Methodologies in Construction Projects Design Management', test, 7(2), pp. 152-166. doi: 10.21608/fuje.2024.343809
Abou-Aly, A., Khodeir, L., ElAbd, N. Identification of the Need for Agile Methodologies in Construction Projects Design Management. test, 2024; 7(2): 152-166. doi: 10.21608/fuje.2024.343809