Anwar, A. (2024). Upgrading the load carrying capacity of old riveted steel bridge – Case study. test, 53(3), 113-124. doi: 10.21608/erjsh.2024.264956.1276
Ahmed M. Anwar. "Upgrading the load carrying capacity of old riveted steel bridge – Case study". test, 53, 3, 2024, 113-124. doi: 10.21608/erjsh.2024.264956.1276
Anwar, A. (2024). 'Upgrading the load carrying capacity of old riveted steel bridge – Case study', test, 53(3), pp. 113-124. doi: 10.21608/erjsh.2024.264956.1276
Anwar, A. Upgrading the load carrying capacity of old riveted steel bridge – Case study. test, 2024; 53(3): 113-124. doi: 10.21608/erjsh.2024.264956.1276