Eldosouky, I., Ibrahim,, A., Mohammed, H. (2014). APPROACH FOR DETERMINATION OF COST CONTINGENCY RESERVE IN CONSTRUCTION PROJECTS. test, 17(4), 4-5. doi: 10.21608/eijest.2014.97092
I Eldosouky; A Ibrahim,; H Mohammed. "APPROACH FOR DETERMINATION OF COST CONTINGENCY RESERVE IN CONSTRUCTION PROJECTS". test, 17, 4, 2014, 4-5. doi: 10.21608/eijest.2014.97092
Eldosouky, I., Ibrahim,, A., Mohammed, H. (2014). 'APPROACH FOR DETERMINATION OF COST CONTINGENCY RESERVE IN CONSTRUCTION PROJECTS', test, 17(4), pp. 4-5. doi: 10.21608/eijest.2014.97092
Eldosouky, I., Ibrahim,, A., Mohammed, H. APPROACH FOR DETERMINATION OF COST CONTINGENCY RESERVE IN CONSTRUCTION PROJECTS. test, 2014; 17(4): 4-5. doi: 10.21608/eijest.2014.97092